Customization: | Available |
---|---|
Customized: | Non-Customized |
Length: | 100mm-1000mm |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Hand Use Scotch Eye Pattern Wood Ring Auger Drill Bit for Wood Drilling |
Material | Carbon Steel with Heat Treatment |
Shank |
Hand Use Shank (Hex Shank, Quick Change Hex Shank and SDS Plus Shank are available) |
Flute |
Single Flute with Stem (Single Flute without stem, Double Flutes, Three Flutes and Four Flutes are available) |
Head Tip | Single Spur with Screw Point (Double Spurs, Three Spurs, and Quad Head Four Spurs are avaiable) |
Surface Finish | Black & Bright (Color Painting and Titanium coating are available) |
Package | One Piece in One PVC Pouch, PVC Tube or PVC Double Blister |
Features |
1. Designed for using by hand. 2. Made from high quality, hardened steel for added durability. 3. Remove the hand Use shank and use in an electric drill. 4. Extra-long twist is ideal for boring large poles, construction timbers, and for multiple timber applications. 5. Solid center design provides extra rigidity while boring. 6. Screw point tip allows bit to self-feed for ease of drilling. 7. Single spur, cutter, and side lip are designed for boring through creosoted poles without clogging, binding, or stopping to clear chips. |
Why Choose Us:
Q1: What is the biggest advantage compared to the rivals?
A1: We are one of the strongest power tool accessories and hand tools suppliers in China.
Q2: What about the payment and delivery time?
A2: Delivery time: 21-45days after your down payment.
Payment: Western Union, T/T, ETC.
100% protection for product quality, on-time shipment and payment.
Q3: Can I get some samples?
A3: Yes, we are honored to offer you samples for quality check at your freight cost.
Q4: How does your factory do regarding quality control?
A4: Quality is priority. PERFECT People always attach great importance to quality control from the very
beginning to the end of the production. Every product will be carefully tested before it's packed for shipment.